Total scripts = 2
1. First script:
How to schedule this scenario???
If you would like to apply different load policy for your two user profiles, you have to use 2 populations since the load is applied at the population level.
There's no difference running the test with one or two populations.
Hi Nouredine
Here one population consist of two scripts. For this two scripts I need to give different load and timing. This kind of scenario can't be done ???
To get different load profiles, you must use two populations
1. Population A - 100% script1, then select the population in the Scenario panel and put the load profile here.
2. Population B - 100% script 2, then select the population in the Scenario panel and put the other load profile here.
You get a scenario with two population checked, with two different load profiles in parallel.
Do you have a constraint to get the two scripts in one population?
yes I have to put this two script in one population not in different population.
Why do you need to use a single population?
For example In india[population1]
Number of users will be more in search transaction but number of users will be less in purchase transaction because only few users will be purchasing the product what they are seaching for.
This scenario can be done in Load runner. So I thought it can be done in Neoload too. But I couldnt find that option in Neoload. Is there any way to do this scenario?? Or it's not possible.
Sorry, I don't understand why the proposal with two populations, two load profiles within a single scenario doesn't work for you.
christophe answered
Keerthy answered
christophe answered
Keerthy answered
christophe answered
Keerthy answered
Keerthy answered
Nouredine answered