Corey B.

  • 2 questions asked
  • 0 answers
  • 0 best answers (0%)
  • Execution of test

    After setting up my test to be executed. Is there a way to extend the testing time while the test is being executed?
    Corey B.
    Corey B.

    Corey B.

    Level
    0
    3 / 100
    points
    Neil W.
    Neil W.

    Neil W.

    Level
    4
    5000 / 5000
    points
    Team
    no, this is not possible, you would be better to select unlimited for the duration
  • Can one of the LG be both a LG and a controller?

    We are trying to set up a continuous delivery using IBM Urban Code Deliver (UCD). I do have the agent on the NTS server. Do I need a dedicated controller or can one of my load...
    Corey B.
    Corey B.

    Corey B.

    Level
    0
    3 / 100
    points
    Nouredine A.
    Nouredine A.

    Nouredine A.

    Level
    4
    5000 / 5000
    points
    Team
    A controller embeds a load generator so if needed you can use that LG. But if you have installed a Load generator only you can't use it as controller.