What if the num of users is lower than the num of user paths in a population?
For example, let's say I have a Population with 12 User Paths, and they're weighted in some way...
If you have 12 User Paths in your population and you run only 5 concurrent users except if your users are stopped at runtime so NeoLoad can start new users only 5 user paths...
We're pretty new to NL, using 7.3.
We can use JS to create a new random date, and that works, in the format example 12/15/2020.
But when we try to use that as a variable...
Thanks, Neil. A coworker was trying to make a variable that was a random date between two known dates. I think he''s gotten it working since I posted the question yesterday.
How do I keep 2 variables in-sync? For example, I have a csv file with 2 columns, ParamA and ParamB. In LoadRunner I can tell the tool to keep and use them only in pairs.
For...